General Mantainance

Inviato da Laura R il
  • Disconnected from the line 08:41 UTC.
  • Cleaning of the optical chamber.
  • Flow calibration.
  • Leakage test at 5 lpm. Result 0% flow difference. Acceptable.
  • Stability test. Acceptable.
  • Clean air test. Acceptable.
  • Flow measured 5.004 lpm (std 101325 Pa, 0°C)
  • Zero performed 12:20-13:40 UTC (Results in table).
  • Reconnected to the line 15:00 UTC. 
operatore
data evento
27-Ago-2024
è uno spostamento?
no