Maintenance

Inviato da Laura R il
  • 15:30 UTC disconnected from the line
  • flow measured ambient condition 17 lpm 
  • cleaned from insects inside the chamber 
  • flow unstable varying form the correct one 17 lpm to 2 lpm periodically
  • 07:55 8-11-2024 UTC reconnected to the line 
  • acquisition issue (some of the settings lost by switching off were not reset correctly, check)

Maintenance

Inviato da Laura R il
  • 13:22 UTC Disconnected from the line and turned off 
  • Cleaning of insect trap and optical chamber
  • optical calibration (acceptable)
  • flow calibration, flow measured after calibration 4.980 lpm in STP (stp factor used 0.74)
  • 13:50 UTC reconnected to the line

General maintenance

Inviato da Laura R il
  • 7:00 UTC disconnected from inlet
  • Measured flow 6.987 lpm (23°C, 78700 Pa)
  • Chamber cleaning
  • Span check
  • Zero check
  • Full calibration + zero adjust
  • 10:37 UTC reconnected to inlet
  • Raspberry replacement (acquisition not started)

General Mantainance

Inviato da Laura R il
  • Disconnected from the line 08:41 UTC.
  • Cleaning of the optical chamber.
  • Flow calibration.
  • Leakage test at 5 lpm. Result 0% flow difference. Acceptable.
  • Stability test. Acceptable.
  • Clean air test. Acceptable.
  • Flow measured 5.004 lpm (std 101325 Pa, 0°C)
  • Zero performed 12:20-13:40 UTC (Results in table).
  • Reconnected to the line 15:00 UTC.