Neutral cluster and Air Ion Spectrometer (NAIS)
ultima posizione
posizione | data evento | Desrizione |
---|---|---|
in osservatorio | Issue SummaryStill unknown the reason why the overheating occurred. Actions taken
Follow-Up and Testing
Current StatusThe instrument is operational with a minor, negligible warning regarding the negative charger current fluctuation. There are no expected internal leaks, and the system should function as intended. Recommendations
|
logbook
Titolo | data | operatore | Descrizione |
---|---|---|---|
Pulizia | Effettuata pulizia. Servono panni ottici per la prossima volta |
||
Re-Installazione NAIS | Mazzini Martina | Issue SummaryStill unknown the reason why the overheating occurred. Actions taken
Follow-Up and Testing
Current StatusThe instrument is operational with a minor, negligible warning regarding the negative charger current fluctuation. There are no expected internal leaks, and the system should function as intended. Recommendations
|
|
Removed for unidentified problem | Mazzini Martina | Very noisy since the dust event happened a cleaning was needed. After removing the case we found black material coming from the connection of all the electrometers(both neg, pos column and 2 discharger sockets) and some wierd black spots aroud the uppercase and copper inlet tube. Transfer to Bologna lab for better checking. |
|
Pulizia e rimozione ghiaccio dall'inlet | Mazzini Martina | The columns have been cleaned. (Panni ottici rimasti per la pulizia: 5 spessi, 5/6 fini) Sample flow was very low during the previous week due to ice formation on the entire inlet wall, obstructing the sampling of air. The heating system has been reactivated.
|
|
Pulizia | Mazzini Martina | Pulizia delle colonne |
consumabili per strumento
Nome consumabile | marca | modello | note |
---|---|---|---|