logbook
Titolo | data | operatore | Descrizione |
---|---|---|---|
Maintenance | Renzi Laura |
|
|
General Mantainance | Renzi Laura |
|
|
acquisition frequency change | Marinoni Angela | From 1 second to 1 minute |
|
re-installation after TROPOS workshop | Operatore Cecilia Magnani |
||
Chamber cleaning and disconnection | At 9:30 disconnected to be brought to leipzig for intercomparison. Cleaned after disconnection.
|
||
data exported from memory card | Marinoni Angela | already on ozone.isac.bo.cnr.it |
|
filter tape replacement | Marinoni Angela | Filter tape replacement after 5 days without measurements. |
|
spegnimento cautelativo | Marinoni Angela | Spento in via cautelativa per presenza acqua sulla superficie superiore, infiltrata attraverso il lato esterno della testa di prelievo. |
|
flow cal | Marinoni Angela | Verifica flusso (3.66 lpm contro i 5 letti dal MFC interno) STD cond. Flow cal performed and new settings saved. Restarted, no possible to reach the ideal flow at 5 lpm. New flow set at 4 lpm NIST (0°C, 1013 hPa). DATA download. |
|
nuovo software ACTRIS | Marinoni Angela | Installazione PC NUC e test trasmissione dati con TROPOS. |
|
riavvio e cambio orario | Marinoni Angela | Riavvio dopo lavori edili |
|
riavvio e cambio ora | Marinoni Angela | Riavvio dopo lavori edili ciclone rimosso prima dell'interruzione |
|
spegnimento per lavori edili | Marinoni Angela | ||
installazione ciclone PM1 | Marinoni Angela | disconnesso dalla linea per installazione cilclone PM1 tra le 15:10 e le 15:20 (UTC+2) |
|
cambio sistema di acquisizione | Acquisizione modificata da psoftware Labview su PC a raspberry, files nella cartella /home/cimone/data/aethal33_dry |